Replacement of an existing fence with the exact same material and height does not require the approval of the ACCE Committee, but a Notice of Construction form should be provided to the ACCE Committee. In the event no approval or disapproval is provided to the homeowner, then the fence is approved by default and Article VII is considered fully complied with. Once the fence application request has been submitted the ACCE Committee and/or Board of Directors have 30 days from the submission to approve or disapprove the request. In addition, the application must provide a photo of the proposed fence style including height, material, and color. All applications for new fences and replacement of an existing fence with a different style must include detailed drawings of the proposed fence line on the property. Finally, they will look at the materials and harmony of the external designs of the existing structures all in accordance with the restrictive covenants, specifically Article VI Section 2 and Article VII.Ī Briarwood homeowner desiring to install a fence or change an existing fence must first submit a Fence Request form found on the Briarwood HOA website and receive approval from the ACCE Committee prior to installation. They will consider the context of the immediate surroundings and balance the homeowners rights and safety. The function of the ACCE Committee and Board of Directors is to review and consider each application objectively. OBJECTIVE OF THIS DOCUMENT: To provide general guidance to the homeowners of the Briarwood neighborhood in regards to the fence installation application process. BRIARWOOD FENCE GUIDANCE DOCUMENT Adopted by BHOA Board of Directors March 8, 2022 To install a fence or change an existing fence you must submit a Fence Request Form and receive approval from the ACCE Committee.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |